Battery Energy Storage System
All Projects
BESS Installation

Battery Energy Storage System

North Macedonia5 MW / 25 MWh

Project Overview

BESS installation and system implementation

The installation of this Battery Energy Storage System marks an important reference in our participation in next-generation energy infrastructure. As storage becomes increasingly central to energy flexibility, grid responsiveness, and renewable integration, this project reflects our growing role in the implementation of assets that support a more dynamic and resilient power system.

The system was configured as three units of 1.5 MW / 5 MWh and one unit of 1.5 MW / 10 MWh, resulting in a total installed storage capacity of 5 MW / 25 MWh. The project demonstrates our ability to contribute to technically advanced energy systems where performance, integration quality, and operational reliability are central to long-term value creation.

Project Gallery

Technical Details

Configuration

3 × (1.5 MW / 5 MWh) + 1 × (1.5 MW / 10 MWh)

Total Power

5 MW

Total Storage

25 MWh

Ready to Start Your Project?

Let's discuss how Mega Watt Hour can deliver your renewable energy vision with engineering excellence.

Get in Touch